ELITE ENDURANCE EQUIPMENT / TRAINING ENGINE

Make every
effort count.

Plan your training. Perform with purpose. See the work add up. One connected platform for athletes who take ownership of every session.

BUILT FOR THE WORK01 / 04
ONE SYSTEM. EVERY SESSION.

Training is more than a score.

It is the plan you made, the effort you put in and the progress you can see. Training Engine brings those moments together. Connected equipment helps capture the details while you stay in motion.

01Build the workout
02Perform the work
03Review the result
TRAINING ENGINE / THE APP

Your entire session.
In your hands.

Build workouts with blocks and stations, choose your movements and targets, and follow the session through. Your results stay together so you can return to the work that matters.

01Create with intent

Shape sessions around your own exercises, structure and goals.

02Train with focus

Follow the workout you planned and capture the result.

03See what changes

Revisit your history, compare sessions and track progress.

Workout builder with blocks, stations and exercise targets
Training Engine home dashboard with weekly activity
REAL TRAINING ENGINE SCREENS
CONNECTED EQUIPMENT

Less counting.
More doing.

Elite Endurance Equipment develops devices that turn physical actions into workout data. Training Engine also includes connection options for Concept2 equipment.

01 / WALL BALL TARGET

Hit the target.
Keep your rhythm.

Every successful wall-ball hit is a rep you should be able to trust. The connected Wall Ball Target is designed to register hits and bring the count into a supported Training Engine session.

THE MOVEMENTThrow → hit → count
Ask about the target
02 / FLOOR BEACON

Own the distance.
Lose the tally.

Set the distance for a movement. When you return near the beacon, that distance can be added to your exercise. A simple way to follow repeatable routes in work such as farmer carries and sandbag lunges.

THE MOVEMENTMove → return → add distance
Ask about the beacon
03 / CONCEPT2 EQUIPMENT

Your erg work.
In the same flow.

Training Engine includes connection options for RowErg, SkiErg and BikeErg sessions, so erg movements can sit alongside the rest of your workout.

SUPPORTED MOVEMENTSRow · Ski · Bike
Ask about compatibility
ONE WORKOUT.
MORE WAYS TO MOVE.
Photorealistic generated image of an indoor rowing ergometer
ROWERG
Photorealistic generated image of an indoor ski ergometer
SKIERG
Photorealistic generated image of an indoor cycling ergometer
BIKEERG
GENERATED EQUIPMENT IMAGERY · FOR ILLUSTRATION
Equipment compatibility and availability depend on the device and app version. Contact us for current details.
THE NEXT SESSION IS YOURS

Built for athletes
who show up.

Training Engine is focused on individual training today. Team workout options are part of the future of Elite Endurance Equipment.

Training Engine logo
Training EnginePlan it. Perform it. Progress.
GET IT ONGoogle PlayAvailable now
DOWNLOAD ON THEApp StoreComing soon
Available now on Android. The iPhone version is coming soon.